File #: 25-0180    Version: 1 Name:
Type: Planning Item Status: Regular Agenda
File created: 5/9/2025 In control: Planning Commission
On agenda: 5/15/2025 Final action:
Title: 794 Genesis Road - Sewer Line Extension
Sponsors: Planning Commission
Attachments: 1. 794 Genesis Rd Sewer Extension Request, 2. Cost Estimate_sewer extension, 3. Genesis LPS Extention Request
Date Ver.Action ByActionResultAction DetailsMeeting DetailsPlayback
No records to display.

Title

794 Genesis Road - Sewer Line Extension

 

Body

SUMMARY: The owner of the property located at 794 Genesis Road has requested a sewer line extension. There is a developer that is wishing to purchase the property for the purpose of constructing multifamily apartments. There is an existing gravity sewer line located approximately 300ish feet to the south of the property along Genesis Road. City staff is proposing a low-pressure sewer line installation instead of continuing the gravity. The low-pressure line would need to cross the proposed multifamily development to allow any requests for connections to the property to the north of the proposed development. A 2-inch low pressure line would be sufficient for the proposed development as well as any development to the north. Total extension would be approximately 480 feet of 2-inch low pressure sewer line. Under the Main Line Extension ordinance (18-107) the property owner/developer of the multifamily development would be responsible for the total cost of the sewer line extension. The cost estimate for the extension is $5,798.20. The developer may pay the city for the install or install/hire someone to install the line themselves. If the latter is chosen, then a financial guarantee in the amount of the estimate plus 10% would need to be provided to the city and would be good for 12 months.

 

Easements may need to be acquired for the sewer line extension. If the developer cannot obtain them and requires the city to obtain them, then the developer must pay the city $3,442.00 for the easements.

 

STAFF RECOMMENDATION: Staff recommends approval of the sewer line extension. The Planning Commission acts as an advisory board for mainline extensions. The final approval or denial is left up to the City Council.

 

Recommended Action

NECESSARY PLANNING COMMISSION ACTION: Recommend approval of the sewer line extension to the Crossville City Council.