SUMMARY:
In the design of the runway lighting project, it was determined that the electrical vault currently housing the runway and taxiway regulators was not up to code.  Additional engineering services were required for the design.  In addition, due to the lack of bidders, an additional pre-bid conference was scheduled.  Atkins has requested an addendum to their contract in the amount of $6,500 to cover the extra costs.  This cost should be covered under the 95/5 grant from the State, leaving the City's cost at $325.
 
BUDGET ACCOUNT:  110-52500-930-002
 
Recommended Action