Title
Wyatt Loop Site Plan Addition
Body
SUMMARY: Bruce Wyatt, the developer on Wyatt Loop is proposing an addition to the site plan that was previously approved by the Planning Commission. He is now proposing 3 units on this property instead of the single unit as approved. This new site plan will require the addition of a stormwater management structure, that was not needed with just the addition of a single building. All three proposed units will be fed by a proposed master meter for water and will use an existing pump station connected to the 4inch LPS located on Wyatt Loop.
STAFF RECOMMENDATION: The Engineering Dept had some comments and concerns in regard to the placement and elevation of the stormwater structure as it is near an possibly encroaching on the ROW. An additional note has been added to the site plan; however, Engineering has not completed their review of the change. This should not hinder or prevent the approval of the site plan, with a note stating Engineering Dept is currently reviewing the note and may need additional information. Any concerns that remain can be addressed in the stormwater permit process. Staff recommends approval of the site plan contingent upon any required stormwater permits.
Recommended Action
NECESSARY PLANNING COMMISSION ACTION: Approve the site plan contingent upon any required stormwater permits