Title
Emerald Leaf Phase 2 - Final Plat Rescission
Body
SUMMARY: Planning Staff and the submitting engineers overlooked a section of the existing utilities that needs to be addressed before the final plat for Emerald Leaf Phase 2 can be approved and recorded. The six required fire hydrants are NOT existing and are shown as proposed. Either a financial guarantee would need to be provided or the developer can pay for the installation of the six fire hydrants and the plat would need to be changed, showing the fire hydrants as existing. From discussion with the engineers, it is believed that the developer will pay for the new hydrants and resubmit the plat at the November Planning Commission Meeting. Staff is waiting on a cost estimate for the hydrants to provide the developer with the required total payment cost.
STAFF RECOMMENDATION: In order to clean up the minutes, Planning Commission does need to rescind their previous approval of the plat. Once the cost estimate is provided to Planning Staff, the developer will be informed so they can make the payment and resubmit the plat with the required changes.
Recommended Action
NECESSARY PLANNING COMMISSION ACTION: Rescind the approval of the plat