SUMMARY: On March 16, 2023 the Crossville Regional Planning Commission met for its monthly meeting and discussed a variance request. A property owner on Peachtree Drive is requesting a variance to the City's Policy for Water and Sewer Line Extensions and the Water and Sewer Main Line Extension Ordinance (18-107). Peachtree Drive is in a failed subdivision, a portion of Hide A Way Hills.
The property owner is requesting to set a meter at the end of the existing water line and run a 1-inch service line to be installed along the unimproved right-of-way of Peachtree Drive, approximately 700 feet from the existing water line to their property at their expense. This private service line would be in lieu of a mainline extension as would be required by the aforementioned ordinance and policy.
If a main water line were to be extended into a failed subdivision with a potential high number of buildable lots, a minimum of a 6-inch line would be needed to provide adequate fire protection, as well as water service.
If the property owner wants to run a private line, the required criteria of permission from the county or private easements would have to be provided BEFORE the City could even consider the proposed private line extension, which has not fully been granted. Attached is an email staff received from the County Mayor Foster. Planning Staff then reached out to the County Planner to fully explain the situation and the City's need for a more defined answer. In addition to the missing criteria, the statement of, "Private lines will not be approved in an existing subdivision," does not differentiate between a failed subdivision or not.
The policy states, "Unless otherwise approved by City Council, service line will extend no further than 75' from a utility main line." This request is almost 10 times the allowed distance.
The policy gives a path forward for th...