Legislation Details

File #: 26-0439    Version: 1 Name: Club Car Wash - Site Plan
Type: Planning Item Status: Regular Agenda
File created: 11/16/2026 In control: Planning Commission
On agenda: 11/19/2026 Final action:
Title: Club Car Wash – Site Plan
Sponsors: Planning Commission
Attachments: 1. Club Car Wash Crossville Site Plan_11-13-26
Date Ver.Action ByActionResultAction DetailsMeeting DetailsPlayback
No records to display.

Title

Club Car Wash - Site Plan

 

Body

SUMMARY: A developer is proposing the construction of a car wash at the corner of Genesis Road and the proposed road that will service the new shopping center across from Buc-ee’s. There is one driveway entrance proposed approximately 200 feet from the new intersection. New water and sewer connections are proposed to the existing lines along Genesis Road. The proposed canopy for the kiosk does overhang the side setback, nearest Starbucks, by 2 feet. They are requesting a side setback variance to allow the overhang encroachment. As it was originally designed, the stormwater detention for Starbucks is located on this lot. An adequate easement must be provided and recorded to allow Starbucks stormwater to flow into the newly proposed underground detention system. There is an existing billboard located on the property, the height from the proposed elevation to the bottom of the billboard must be stated to allow for free travel in their proposed driveway.

 

STAFF RECOMMENDATION: Staff recommends approval of the variance and of the site plan contingent upon approval of the utility connections by the city staff, the height of the billboard, and storm water permits and easements.

 

Recommended Action

NECESSARY PLANNING COMMISSION ACTION: Two Motions: First, approve the variance. Second, approve the site plan contingent upon approved utility connections, stormwater permits and easements, and verification of the free travel lane under the existing billboard.