File #: 14-0232    Version: 1 Name: Downtown water lines
Type: Contract Status: Consent Agenda
File created: 5/28/2014 In control: City Council
On agenda: 6/10/2014 Final action: 6/10/2014
Title: Approval of Engineering Contract with EG&G for water main re-design in downtown area
Sponsors: City Manager, Engineering Department
Attachments: 1. Amendment No 3 - Crossville Water Main
Title
Approval of Engineering Contract with EG&G for water main re-design in downtown area
Body
SUMMARY:
A proposed contract has been received from EG&G to redesign the water main for the downtown area and prepare a bid package.  The proposed fee is $11,000.