File #: 15-0014    Version: 1 Name: Downtown sidewalks
Type: Contract Status: Passed
File created: 12/29/2014 In control: City Council
On agenda: 1/13/2015 Final action: 1/13/2015
Title: Discussion and action on contract with EG&G on downtown sidewalks
Sponsors: City Manager, Engineering Department
Attachments: 1. EG&G contract-sidewalks preliminary
Related files: 17-0128
Title
Discussion and action on contract with EG&G on downtown sidewalks
 
Body
SUMMARY:
TDOT is scheduled to re-pave Main Street in March 2015.  As discussed in work session, a request needs to be made to delay the paving one year so that the sidewalks can be replaced.
A proposed contract for $18,950 is attached to review the project area to determine the sidewalk and curb areas that do not meet current ADA requirements and/or in poor condition, provide design, and an opinion of probable construction cost.  
 
BUDGET ACCOUNT:
 
Recommended Action
NECESSARY COUNCIL ACTION:  Direct the City Manager to request a one-year extension on the re-paving of Main Street and approve contract with EG&G.