File #: 18-0236    Version: 1 Name: Meadow Park Trail Bridge
Type: Contract Status: Passed
File created: 5/31/2018 In control: City Council
On agenda: 6/12/2018 Final action: 6/12/2018
Title: Approval of engineering services for Meadow Park Trail Bridge
Sponsors: Engineering Department, Tim Begley, Meadow Park Lake
Attachments: 1. A2H Proposal

Title

Approval of engineering services for Meadow Park Trail Bridge

 

Body

SUMMARY: The Director of Engineering met with Meadow Park Lake Commission on May 21st and discussed the engineering services for the Meadow Park Trail Bridge. The Meadow Park Lake Commission voted to recommend the attached proposal from A2H with the modifications of the prices added and an option to stop or terminate, or place the contract on hold if the existing electrical poles would not span the stream. The price for phase 1 is $6,800 and the price for phase 2 is 8,800.

 

Kyle Hazel with A2H has completed 3 bridge projects with the Cumberland County Road Department and is working on a fourth.

 

The City Engineering Department would be in charge of permits and the ground survey.

It is very important that a local engineer be hired for this project so that the site visits for the foundation work has a minimal travel time.

 

BUDGET ACCOUNT:

 

Recommended Action

NECESSARY COUNCIL ACTION: Approve proposal